Construction Begins

September 27, 2008 at 6:02 pm Leave a comment

After fixing the alignment on my miter saw I mitered the boards for the sides of the case. With some tuning of the corners I glued it up. There is a good amount of chip out where I cut the miters that will need to be dealt with but here we are in the assembly. I will be adding a slight round over to take out the chip outs.



Still to do:
1. Get the artwork finished
2. Cut and paint the base
3. Route out the top for the joystick
4. Drill the holes for the side buttons and top buttons
5. Apply the finish to the sides of the case
6. Setup the Plexiglas for lighting.
7. Hack the game pad
8. Install the controls

As you see there is still quite a bit to do but the first step on real construction has been completed.

Game On!

Advertisements

Entry filed under: Joystick, Narra.

From “Narly” to Beautiful Let the Post Season Begin

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Trackback this post  |  Subscribe to the comments via RSS Feed


He who works with his hands is a laborer.
He who works with his hands and his head is a craftsman.
He who works with his hands and his head and his heart is an artist.
– St. Francis of Assisi
Where do you fit?

Post History

Blog Stats

  • 19,652 hits

%d bloggers like this: